Scale Your Cost Segregation Studies
Without Drowning in Plan Takeoffs, ALTA Audits & RSMeans Cost Allocation
Stop spending late nights extracting site improvements from 200-page architectural blueprints, reconciling HUD-1 closing statements, and hand-keying 5-, 7-, and 15-year MACRS asset schedules. Sagedoer provides vetted, managed Virtual Assistants specialized in Bluebeam quantity takeoffs, RSMeans/Marshall & Swift unit pricing, Form 3115 look-back schedules, Section 179D/45L data prep, and IRS ATG audit-ready report assembly. Supervised daily by a dedicated Project Manager at zero extra cost.
Precision Cost Segregation Support Built for CPAs & Engineering Firms
Your senior engineering and tax expertise belongs in final property classifications, audit defense discussions, and commercial real estate client acquisition. Let our managed assistants handle the time-draining document indexing, plan takeoffs, and preliminary allocation workbooks.
Basis Auditing & Document Intake
Transform chaotic acquisition folders into organized tax workpapers. We audit HUD-1 and ALTA settlement statements, reconcile county tax assessor land-to-building allocations, and standardize depreciation baselines for new and legacy acquisitions.
- Settlement statement purchase price & capitalized fee extraction
- Assessor real market value (RMV) land ratio analysis
- Client portal intake chasing: blueprints, appraisals & invoices
Bluebeam Quantity Takeoffs
Eliminate tedious manual scaling. We navigate architectural, civil, MEP, and landscaping plans in Bluebeam Revu, calculating square footage and linear footages for parking lots, concrete curbs, decorative millwork, and dedicated branch wiring.
- Site improvement takeoffs: asphalt paving, fencing, and curbs
- Interior finishes: specialty flooring, acoustic ceilings, and cabinetry
- Electrical & mechanical: dedicated equipment feeds and accent fixtures
Cost Modeling & Unit Pricing
Bridge engineering takeoffs with historical replacement cost databases. We map takeoff quantities to RSMeans Online and Marshall & Swift unit rates, applying regional city cost indexes (CCI) and historical inflation adjustments.
- RSMeans unit cost extraction and material/labor index adjustments
- Marshall & Swift square foot calculator & component breakdown
- Indirect soft cost allocation (permits, architectural fees, financing)
MACRS Asset Class Scheduling
Accelerate depreciation accurately under IRC § 1245 and § 1250. We build preliminary asset matrices reallocating costs into 5-year, 7-year personal property and 15-year land improvements while isolating 27.5-year / 39-year building structures.
- Whiteco Industries 6-factor test documentation for § 1245 property
- Bonus depreciation phase-out schedules (100%, 80%, 60%, 40%, 20%)
- Qualified Improvement Property (QIP) 15-year classification
Form 3115 & §481(a) Workpapers
Unlock missed depreciation on previously placed-in-service buildings without amending past returns. We calculate Section 481(a) favorable adjustments and draft automatic accounting method change attachments (DCN #7).
- Prior depreciation allowed vs. allowable calculation tables
- Form 3115 look-back study schedule & statement formatting
- Partial Asset Disposition (PAD) write-off calculations (Reg. 1.168(i)-8)
IRS ATG Audit Trail Assembly
Deliver defensible, polished engineering reports that sail through IRS scrutiny. We assemble site inspection photo logs, link technical engineering narratives to line items, and catalog workpapers matching the IRS Cost Segregation Audit Techniques Guide.
- Site inspection photo indexing, geotag verification & captioning
- Technical report narrative formatting in Word / Adobe InDesign
- CPA deliverable bundling: executive summaries & fixed asset import files
Fluent Across the Core Engineering & Tax Software Ecosystem
Zero downtime learning tools. Our VAs integrate seamlessly into your takeoff software, estimating databases, and tax fixed-asset modules from day one.
4 Steps to Seamless Cost Segregation Practice Delegation
You shouldn't spend billable senior consulting hours pulling PDF measurements, tagging site photos, or chasing missing ALTA statements. We oversee end-to-end study coordination.
Submit Requirements
Share your specific cost segregation practice needs, typical asset classes (multifamily, industrial, retail, self-storage), and software stack. Reach out via Email, Form, or WhatsApp.
Finalise the Deal
Our dedicated project manager reviews your volume, establishes secure NDA protocols, aligns Bluebeam takeoff guidelines, and finalises the partnership details.
Expert Execution
Your project manager oversees study turnaround, verifying takeoff accuracy and workpaper formulas before submitting drafts for your final professional engineering sign-off.
Pay Only for Output
We log and charge exclusively for the virtual assistant's actual working time. Your dedicated project manager's supervision and quality checks are completely free.
Why Cost Segregation Practices Choose Sagedoer
Hiring unvetted freelance contractors on open marketplaces exposes confidential tax returns, settlement statements, and client financials to major risk.
| Evaluation Point | Traditional Freelance Platforms | The Smart Choice: Sagedoer |
|---|---|---|
| Platform & Management Fees | Up to 40% in hidden markups, bidding, and memberships | 0% Hidden Fees. Pay strictly for hours worked. |
| Daily Team Management | You must juggle, train, and supervise multiple freelancers | Dedicated Project Manager acts as your single point of contact |
| Quality Assurance | Hit-or-miss talent unfamiliar with MACRS or RSMeans standards | Internally vetted specialists trained in plan takeoffs & tax files |
| Hiring & Deployment Speed | Weeks lost reviewing portfolios and conducting test takeoffs | Instant delegation. We immediately assign the right specialist. |
| Billing & Invoicing | Complex, multi-freelancer invoices with currency headaches | Simple, unified, centralised USD invoicing |
| Staff Turnover & Continuity | Start the training process all over again when freelancers churn | Seamless internal replacements with zero workflow disruption |
Transparent Hourly Rates, Zero Platform Markups
Your Dedicated Project Manager is included free with every plan. You only pay for tracked engineering and study administration hours.
Est. $560 USD / Month (4 Weeks)
Est. $960 USD / Month (4 Weeks)
Calculate Your Monthly Engineering Overhead Savings
Adjust your required weekly Bluebeam takeoff, ALTA reconciliation, and RSMeans allocation hours to compare Sagedoer against traditional in-house junior estimators.
Trusted by Leading Cost Segregation Engineers & Tax Advisors
Hover over any feedback card to pause the continuous marquee ticker.
"Our Sagedoer VA completes Bluebeam takeoffs on 150,000 sq ft industrial facilities with incredible precision. They extract concrete paving, site lighting, and millwork faster than any junior hire we've ever had. We doubled our monthly study capacity."
"Reconciling ALTA statements, county land values, and prior tax returns for Form 3115 look-backs was consuming our senior CPAs. Our VA handles the data aggregation and Section 481(a) schedules flawlessly."
"Having a dedicated project manager included at zero extra cost makes all the difference. Our PM QA's every RSMeans cost assignment before our engineers review the draft report. Turnaround dropped from 3 weeks to 6 business days."
"At $6/hr full-time, the ROI is unmatched. They format our audit-defense photo catalogs and prepare our IRS ATG compliance binders so our final deliverables look world-class to our commercial clients."
"Our Sagedoer VA completes Bluebeam takeoffs on 150,000 sq ft industrial facilities with incredible precision. They extract concrete paving, site lighting, and millwork faster than any junior hire we've ever had. We doubled our monthly study capacity."
"Reconciling ALTA statements, county land values, and prior tax returns for Form 3115 look-backs was consuming our senior CPAs. Our VA handles the data aggregation and Section 481(a) schedules flawlessly."
Frequently Asked Questions for Cost Segregation Practitioners
Clear answers regarding digital plan takeoffs, RSMeans database matching, IRS audit techniques, and dedicated management.
Scale Your Study Volume with Zero In-House Overhead.
Whether you operate an independent engineering practice, a commercial real estate tax boutique, or a national CPA specialty group, we match your dedicated cost segregation VA within 24 hours.
Request Your Cost Segregation VA
Receive a tailored breakdown of weekly study support hours, Bluebeam specialist profiles, and assistant matching within 24 hours.
